back to the Dollhouse Workshop
  • Bay Foundations:  Taped with the 45* bevels on the outside
    01.jpg
  • Bay Foundations glued together.  Put a weight on top to hold it tight to the table while the glue dries
    02.jpg
  • The main foundation is glued and nailed together
    03.jpg
  • Glue and tape on the Bay Foundation
    04.jpg
  • Line up the Bay Foundation with the Front Foundation's bevel
    05.jpg
  • If I have plenty of space I glue on the Nosings now.  Here, I have prepared tape
    06.jpg
  • The Rooftops and Tower Ceiling with Nosing glued in place.  The flat side is against the table
    07.jpg
  • The Nosing attached to the Upper Floors (the top is showing)
    08.jpg
  • The Base Floor glued to the Foundation, lined up at the back
    09.jpg
  • I didn't get the Nosing lined up with the floor's top as well as I wanted.  Here I have spread autobody paste (generically called "Bondo") on the uneven surface.  When it is dry, I will scrape and sand it smooth.
    09a.jpg
  • I set up the walls without glue to trace the perimeter on the floors and ceilings for painting.  Here, the End Cap is lined up in back and about 1/8" from the edge of the floor (not the Nosing)
    10.jpg
  • Dividers locate the walls
    11.jpg