back to the Dollhouse Workshop
  • With the Dividers holding the Attic Endwalls nice and straight...
    e30.jpg
  • Set the Front Roof onto the house without glue.  The Gable cutout locates it side-to-side - it should be about the same overhang on each end
    e31.jpg
  • Tape (no glue) the Rear Roof to the Front Roof.  The Rear Roof is beveled where it touches the Front Roof
    e33.jpg
  • Check the Dividers again.  Trace the overhang on the Roofs for painting
    e34.jpg

  • e35.jpg
  • Drawing shingle lines - the first line is the length of one shingle above the roof's edge.
    e40.jpg
  • The rest of the lines are one inch apart
    e41.jpg
  • Mark both edges of the roof and connect the marks
    e42.jpg
  • Tape together the Rear Roof and the eaves
    e43.jpg
  • Transfer the shingle line marks with the roofs lined up at the bottom
    e44.jpg
  • connect the marks
    e45.jpg
  • Transfer the shingle lines to the front edge of the Gable Roofs (see picture #e48 too)
    e46.jpg
  • extend the marks to the back edge of the Gable Roofs using the other roof as a square
    e47.jpg
  • Shingle lines.
    e48.jpg