Slideshows support but do not replace the instructions
Pre-Assembly:
Parts Identification: Packs
Parts Identification: Panels
PreAssemble
Stain and Paint
Assembly:
Housebody
Logs
Attic Logs
Dormer
Nubs
Dormer Roof
Carve
Foundation
Porch 1 Porch 2
Exterior Finishing
Trim
Windows and Shutters
Interior Finishing
Window Trim and Stairs
2024 instructions
|
DHTMLGoodies.com
00. Dormer and Dormer Logs
../../RGT_Website_assets/ajax-loader.gif
DHTMLGoodies.com
02. The Attic Partition supports the Front Roof while you glue it in place
02D.png
DHTMLGoodies.com
05. When the glue is dry, move the Attic Partition to the side of the Dormer
05D.png
DHTMLGoodies.com
10. It was a co-incidence that the Dormer Side's corner lined up here - don't expect it to!
10D.png
DHTMLGoodies.com
13. Dormer Side Logs are cut from 10 17/32
Use the cutting template to get the Dormer Angle
13D.png
DHTMLGoodies.com
25. An imperfect angle at the roof will be covered by shingles
25D.png
DHTMLGoodies.com
27. Up to 1/8th at the bottom of the window cutout will be covered
27D.png
DHTMLGoodies.com
00. Next slideshow (Nubs): Click the "Click" button (above)
../../Buttons/ClickHere.png
|